top of page

Welcome to the Smith & Gorham Relicensing Website

Welcome
J Brodie 3.jpg
gorham 5.jpg

Central Rivers Power (CRP) is filing with the Federal Energy Regulatory Commission (FERC or the Commission) its Notification of Intent to relicense the 15 MW J. Brodie Smith Hydroelectric Project (FERC Project No. 2287). The J. Brodie Smith Hydroelectric Project consists of a 500-foot-long, 24-foot-high masonry and concrete gravity U-shaped dam, a reservoir with a surface area of 8 acres, a spillway, a power canal, a powerhouse containing one generating unit, located on the Androscoggin River in Coos County, New Hampshire. CRP is not proposing to add capacity or make any physical modifications to the Project under the new license. 

Central Rivers Power (CRP) is also filing with the Federal Energy Regulatory Commission (FERC or the Commission) its Notification of Intent (NOI) to relicense the 2.15 MW Gorham Hydroelectric Project (FERC Project No. 2288). The Gorham Hydroelectric Project consists of a 20-foot-high timber crib dam, a reservoir with a surface area of 32 acres, a spillway, a power canal, a powerhouse containing four generating units, located on the Androscoggin River in Coos County, New Hampshire. CRP is not proposing to add capacity or make any physical modifications to the Project under the new license.

 

The current licenses for these projects will expire on July 31, 2024.

Need more information? 
We are here to assist. 
bottom of page